HomeRailways

7th CPC Running Allowance – Minimum Guaranteed Kilometerage (MGK) to running staff: Clarification by Railway

7th CPC Running Allowance: Minimum Guaranteed Kilometerage (MGK) to running staff

 East Coast Railway

Office of the Principal Chief Personnel Officer
Rail Sadan, 2nd floor, Bhubaneswar – 751017

DATED: 13-07-2020

MEMORANDUM

Short sections for Minimum Guaranteed Kilometerage (MGK) and Industrial Coal Pilots for Trip Allowances has been identified vide this office Memorandum No. ECor/Pers/R/Running Allowance/21 dated 05.11.2015 and vide Amendment-I dated 27.07.2016, Addendum-2 dated 11.04.2017. Addendum-3 dated 21.11.2018 and Addendum-4 dated 01.03.2019.

The present system of mileage payment is reviewed for the following reasons:

1. To rectify the defects/anomalies in previous Memorandum.

2. To implement the standard rules/instructions all over ECoR.

3. To accommodate new siding. change in layout as well as changes in pattern of working.

4. To revisit the issued periodically.

In view of the above, the 03 Divisions have reviewed their system for payment of mileage and the divisional review committees have recommended for inclusion of some new short sections for MGK and Coal/Industrial trip for Trip Allowance and also recommended for de-notification of some exiting short sections and Coal/Industrial Pilots. Taking in account all the recommendations from the Divisions a consolidated Memorandum is issue for granting MGK and Trip Allowance to running staff. This Memorandum supersedes all earlier Memorandums issued on he subject matter.

Standard Rules/Instructions

1. Pilot will be eligible to draw the bonus Kilometerage if he completes the trip within target hours.

2. Running staff will earn permissible mileage for the distance covered by him resuming the trip jurisdiction and after completing the trip jurisdiction.

3. For the purpose of drawing trip Kilometerage, the Running staff should perform the trip completely in both the directions.

4. Similarly for drawing Minimum Guaranteed Kilometerage. the Running staff should cover the entire section identified for MGK.

5. Shuttling booking is issued for any section as per requirement of traffic and this is not specified section-wise.

5.1 Within 10 hours of shuttling, Running staff should work as many trains as possible.

6. Running staff is eligible to draw more than one Trip Allowance tt the staff completes more than one trip per one booking.

For the purpose of fixing Trip Targets for various sidings, the normal patterns of working are specified in the following manner:

Only placement In which rake is placed & Running Staff comes back in light Engine is denoted as “A.

Only withdrawal- In which Running Staff goes to the siding in light engine and bring back is denoted as ‘B’.

Placement as well as withdrawal- In which Running Staff goes to the siding with a rake and comes back with a rake as denoted as ‘C‘.

EOL- In which pattern ‘C’ is followed under EOL operations is denoted as ‘D‘.

Revision of channels of Promotion (AVC) of various categories of Medical Department: Railway Board Order RBE No. 178/2019

Annexure: 1

Minimum Guaranteed Kilometerage (MGK) Sections in KUR Division:

  1. BHC to DTY
  2. DTY to BHC
  3. KDJR to JRL
  4. JRLI to KDJR (New)
  5. KDIR to loading sidings & back to KDJR
  6. JKPR to loading sidings & back to JKPR

Trip Targets in KUR Division:

Sl. No. Pattern of Working Jurisdiction Actual distance Trip target time (in hours) Kilometrage earning + Bonus
1. A SKND-NINU -SKND 7 KMs 1 hr. 30 min. 30 + 50
B 2 hours 40 + 50
C 2 hrs. 30 min. 50 + 50
2. A SKND-MMIS -SKND 8 KMs 1 hr. 30 min. 30 + 50
B 2 hours 40 + 50
C 2 hrs. 30 min. 50 + 50
3. A SKND-JSLS-SKND 7 KMs 2 hours 40 + 50
B 2 hrs. 15 min. 45 + 50
C 2 hrs. 45 min. 55 + 50
4. A BYY-MOIB-BYY 12 KMs 2 hours 40 + 50
B 3 hours 60 + 50
C 4 hours 80 + 50
D 7 hours 140 + 50
5. A MRDL-MBMB-MRDL 17.2 KMs 2 hours 40 + 50
B 3 hrs. 30 min. 70 + 50
C 4 hrs. 30 min. 90 + 50
5.1 A BDPK-MBMB- BDPK 13.2 KMs 4 hours 80 + 50
B 4 hrs. 30 min. 90 + 50
C 5 hours 100 + 50
6. A BDPK-MGBK-BDPK 11 KMs 2 hrs. 30 min. 50 + 50
B 3 hours 60 + 50
C 3 hrs. 30 min. 70 + 50
D 4 hrs. 89+50
7. A CAP-IREL-CAP 1 15 KMs 4 hours 80 + 50
B 4 hrs. 30 min. 90 + 50
C 5 hours 100 + 50
8. D ADB yard, PRDP MCHP-ADB 16 KMs 6hours 120 + 50
9 D ADB yard, PRDP MCHP-RRS3/Indra Park-PRDP 16 KMs 6 hours 200 + 50
10. A PRDP-CBSP PRDP 8 KMs 5 hours 100 + 50
B 5 hrs 30 min 110 + 50
C 6 hours 120 + 50
D 7 hours 140 + 50
11. A PRDP-PICT PRDP 13 KMs 5 hours 100 + 50
B 5 hrs 30 min 110 + 50
C 6 hours 120 + 50
D 7 hours 140 + 50
12. A PRDP-IPCP PRDP 6.5 KMs 3 hours 60 + 50
B 3 hrs 30 min 70 + 50
C 5 hours 100 + 50
D 6 hours 120 + 50
13. A CBT-ICCC-CBT 18 kms 2 hrs 30 min 50 + 50
B 3 hours 60 + 50
C 3 hrs 30 min 70 + 50
D 4 hours 80 + 50
14. C ANGL NTPC(NY) ANGL 37 kms 7 hours 140 + 50
15. D TLHR NTPC (MGR) TLHR 66 kms 9 hours 180 + 50
16 D TLHR TTPC TLHR 8 kms 6 hours 120 + 50
17. A TLHR -DBColliery- TLHR 3 kms 3 hours 60 + 50
B 3 hrs 30 min 70 + 50
C 4 hours 80 + 50
D 6 hours 120 + 50
18. A TLHR- LRST-TLHR 4.5 kms 3 hours 60 + 50
B 3 hrs 30 min 70 + 50
C 5 hours 100 + 50
D 7 hours 140 + 50
19. A TLHR- MGCT-TLHR 6 kms 3 hours 60 + 50
B 3 hrs 30 min 70 + 50
C 4 hours 80 + 50
D 6 hours 120 + 50
20. A TLHR-SPUR(1-6)-TLHR 14 kms 3 hours 60 + 50
B 3 hrs 30 min 70 + 50
C 4 hours 80 + 50
D 6 hours 120 + 50
21. A TLHR-SPUR(7-8)-TLHR 28 kms 4 hours 80 + 50
B 4 hrs 30 min 90 + 50
C 5 hours 100 + 50
D 7 hours 140 + 50
22. A TLHR-SPUR(9)-/SSMT(SILO)-TLHR 36 kms 5 hours 100 + 50
B 5 hrs 30 min 110 + 50
C 6 hrs 120 + 50
D 8 hours 160 + 50
23. A TLHR-NTPC(YARD)-TLHR 6 kms 5 hours 100 + 50
B 5 hrs 30 min 110 + 50
C 6 hours 120 + 50
24. A JKPR-TSLI-JKPR 26 kms 5 hours 100 + 50
B 3 hrs 30 min 110 + 50
C 6 hours 120 + 50
25. A TOMKA-DATR-TOMK 16 kms 1 hrs 30 min 30 + 50
B 2 hrs 30 min 50 + 50
C 3 hours 60 + 50
D 6 hours 120 + 50

7th Pay Commission: Railway Board clarification on restriction of Officiating Pay under FR-35 detailed FAQ alongwith suitable illustrations

Annexure-2

Minimum Guaranteed Kilometerage Sections in WAT Division:

1. VZM- SCMN/WMY-VZM
2. RGDA-PVP- RGDA
3. RGDA-THV-RGDA
4. RGDA-BLMK- RGDA
5. TKRl-MUAT-TKRI
6. KRPU -DMNJ-MVF- KRPU
7. WMY/SCMN-MVW-VSPS/MGPV-WMY/ CMN
8. WMY/SCMN -CCJS-WMY/SCMN
9. RGDA-THV-IMFT-RGDA
10. WMY/SCMN-KPL-SCMN/WMY
11. WMY/SCMN -VZM-SCMN/WMY
12. DMNJ-JYP-DMNJ
13. RGDA-PSPG-RGDA
14. WMY/SCMN-MGPV-SCMN/WMY
15. WMY/SCMN -VSPS-SCMN/WMY

Trip Targets in WAT Division:

Sl. No. Pattern of Working Jurisdiction Actual distance(IN KMs) Trip target time (in hours) Kilometrage earning + Bonus
1. D(BOBR) WMY/SCMN -STDV-WMY/SCMN 73.96 KMs 8 hours 160 + 50
2. A WMY/SCMN -STDV-WMY/SCMN 73.96 KMs 5 hOURS 100 + 50
B 5 hrs. 30 min. 110 + 50
C 6 hrs 120 + 50
3. A WMY/SCMN -PDT-APWP-PDT-WMY/SCMN 32.74 KMs 3 hrs. 30 min. 70 + 50
B 4 hrs. 80 + 50
C 4 hrs. 30 min. 90 + 50
4. A WMY/SCMN -MVW-PGSA-MVW-WMY/SCMN 71 KMs 5 hrs. 30 min. 110 + 50
B 6 hours 120 + 50
C 6 hrs. 30 min. 130 + 50
5. A WMY/SCMN-MGPV-DVD-WMY/SCMN 73.96 KMs 6 hours 130 + 50
B 7 hours 140 + 50
C 7 hrs. 30 min. 150 + 50
6 A WMY/SCMN-MGPV-VSPS/STDV-WMY/SCMN 121.98 7 hours 140 + 50
B 7 hrs. 30 min. 150 + 50
C 8 hours 160 + 50
7. C WMY/SCMN-CCIS-MGPV/VSPS-WMY/SCMN 98.16 7 hours 140 + 50

Kendriya Vidyalaya Admission Guidelines 2020-21

Annexure-3

Minimum Guaranteed Kilometerage Sections in SBP Division:

1. SBP-LPG-SBP
2. SBP-LPG-JSG
3. SBP-SBPY-JSG
4.SBP-JSG
5. JSG-SBP
6. JSG-SBPY-SBP
7. JSG-LPG-SBP
8. SBP-BRGA-SBO
9 . TIG-KBI-TIG
10.SBP-BRJN
11. BRJN-SBP
12. SBPY – BRJN
13. BRJN- SBPY
14. MSMD-RGDA
15. AMB-RGDA
16. RGDA-AMB

Trip Targets in SBP Division:

Sl. No. Pattern of Working Jurisdiction Actual distance(IN KMs) Trip target time (in hours) Kilometrage earning + Bonus
1. A  BXQ-MABV-BXQ  13.89 KMS 2 hours 40 + 50
B 3 hours 60 + 50
C 5 hours 100 + 50
C(BFK/BLC-IN RETURN) 6 hours 120 + 50
D(BOBRN) 5 hours 100 + 50
2. A   BXQ-SEBD-BXQ   12.4 KMS  2 hrs. 30 min. 50 + 50
B 3 hours 60 + 50
C 4 hrs. 30 min. 90 + 50
D(BOBRN) 4 hours 80 + 50
3. A   LPG-BPSL-LPG   8.2 KMS 1 hrs. 45 min. 35 + 50
B 2 hrs. 30 min. 50 + 50
C 3 hrs. 30 min. 70 + 50
4. A LPG-MAIL-LPG   5.2 KMS 1 hrs. 45 min. 35 + 50
B 3 hrs. 15 min. 60 + 50
C 1 hrs. 30 min. 65 + 50
5. A(BTAP) LPG-MAAL-LPG   6.3 KMS 1 hrs. 30 min. 30 + 50
B(BTAP)  3 hrs. 60 + 50
C(BTAP) 4 hrs 80 + 50
6. A  LPG-MAAL-LPG   9.19 KMS 2 hrs. 30 min. 50 + 50
B 3 hrs. 60 + 50
C 4 hrs. 80 + 50
C (Smaller yard) 4 hrs. 30 min. 90+50
7. A  RGL-SMER-RGL   4.8 KMS 2 hrs. 30 min. 50 + 50
B 3 hrs. 60 + 50
C 4 hrs. 80 + 50
8. A  SBP-HIW-SBP   17 KMS 2 hrs. 45 min. 55 + 50
B 3 hrs. 30 min. 70 + 50
C 4 hrs. 80 + 50
9. A  BRGA-CFDS[Ex YD]-BRGA   3.2 KMS 1 hrs. 20 + 50
B 3 hrs. 60 + 50
C 3 hrs. 30 min. 70 + 50
10 A  AMB-MVAA-AMB   36.78 KMS 2 hrs. 40 + 50
B 3 hrs. 60 + 50
C 6 hrs. 120 + 50
11. A  TIG-KSNG-TIG   26 KMS 2 hrs. 45 min. 55 + 50
B 3 hrs. 60 + 50
C 4 hrs. 30 min. 90 + 50
12. A  KPJG-JSPK-KPJG   12.2 KMS 3 hrs. 60 + 50
B 4 hrs. 80 + 50
C 5 hrs. 100 + 50

This issue with approval of General Manager

R.N.A Parida
Chairman RRC/Dy. CPO(IR&W)

7th-cpc-running-allowance-minimum-guaranteed-kilometerage-mgk-to-running-staff

Source: Click Here to read/view pdf

[https://eastcoastrail.indianrailways.gov.in/uploads/files/1594726927130-79-20-Min.Guaranteed%20Kilometerage.pdf]

COMMENTS

WORDPRESS: 0