7th CPC Running Allowance: Minimum Guaranteed Kilometerage (MGK) to running staff
East Coast Railway
Office of the Principal Chief Personnel Officer
Rail Sadan, 2nd floor, Bhubaneswar – 751017
DATED: 13-07-2020
MEMORANDUM
Short sections for Minimum Guaranteed Kilometerage (MGK) and Industrial Coal Pilots for Trip Allowances has been identified vide this office Memorandum No. ECor/Pers/R/Running Allowance/21 dated 05.11.2015 and vide Amendment-I dated 27.07.2016, Addendum-2 dated 11.04.2017. Addendum-3 dated 21.11.2018 and Addendum-4 dated 01.03.2019.
The present system of mileage payment is reviewed for the following reasons:
1. To rectify the defects/anomalies in previous Memorandum.
2. To implement the standard rules/instructions all over ECoR.
3. To accommodate new siding. change in layout as well as changes in pattern of working.
4. To revisit the issued periodically.
In view of the above, the 03 Divisions have reviewed their system for payment of mileage and the divisional review committees have recommended for inclusion of some new short sections for MGK and Coal/Industrial trip for Trip Allowance and also recommended for de-notification of some exiting short sections and Coal/Industrial Pilots. Taking in account all the recommendations from the Divisions a consolidated Memorandum is issue for granting MGK and Trip Allowance to running staff. This Memorandum supersedes all earlier Memorandums issued on he subject matter.
Standard Rules/Instructions
1. Pilot will be eligible to draw the bonus Kilometerage if he completes the trip within target hours.
2. Running staff will earn permissible mileage for the distance covered by him resuming the trip jurisdiction and after completing the trip jurisdiction.
3. For the purpose of drawing trip Kilometerage, the Running staff should perform the trip completely in both the directions.
4. Similarly for drawing Minimum Guaranteed Kilometerage. the Running staff should cover the entire section identified for MGK.
5. Shuttling booking is issued for any section as per requirement of traffic and this is not specified section-wise.
5.1 Within 10 hours of shuttling, Running staff should work as many trains as possible.
6. Running staff is eligible to draw more than one Trip Allowance tt the staff completes more than one trip per one booking.
For the purpose of fixing Trip Targets for various sidings, the normal patterns of working are specified in the following manner:
Only placement In which rake is placed & Running Staff comes back in light Engine is denoted as “A.
Only withdrawal- In which Running Staff goes to the siding in light engine and bring back is denoted as ‘B’.
Placement as well as withdrawal- In which Running Staff goes to the siding with a rake and comes back with a rake as denoted as ‘C‘.
EOL- In which pattern ‘C’ is followed under EOL operations is denoted as ‘D‘.
Revision of channels of Promotion (AVC) of various categories of Medical Department: Railway Board Order RBE No. 178/2019
Annexure: 1
Minimum Guaranteed Kilometerage (MGK) Sections in KUR Division:
- BHC to DTY
- DTY to BHC
- KDJR to JRL
- JRLI to KDJR (New)
- KDIR to loading sidings & back to KDJR
- JKPR to loading sidings & back to JKPR
Trip Targets in KUR Division:
Sl. No. | Pattern of Working | Jurisdiction | Actual distance | Trip target time (in hours) | Kilometrage earning + Bonus |
1. | A | SKND-NINU -SKND | 7 KMs | 1 hr. 30 min. | 30 + 50 |
B | 2 hours | 40 + 50 | |||
C | 2 hrs. 30 min. | 50 + 50 | |||
2. | A | SKND-MMIS -SKND | 8 KMs | 1 hr. 30 min. | 30 + 50 |
B | 2 hours | 40 + 50 | |||
C | 2 hrs. 30 min. | 50 + 50 | |||
3. | A | SKND-JSLS-SKND | 7 KMs | 2 hours | 40 + 50 |
B | 2 hrs. 15 min. | 45 + 50 | |||
C | 2 hrs. 45 min. | 55 + 50 | |||
4. | A | BYY-MOIB-BYY | 12 KMs | 2 hours | 40 + 50 |
B | 3 hours | 60 + 50 | |||
C | 4 hours | 80 + 50 | |||
D | 7 hours | 140 + 50 | |||
5. | A | MRDL-MBMB-MRDL | 17.2 KMs | 2 hours | 40 + 50 |
B | 3 hrs. 30 min. | 70 + 50 | |||
C | 4 hrs. 30 min. | 90 + 50 | |||
5.1 | A | BDPK-MBMB- BDPK | 13.2 KMs | 4 hours | 80 + 50 |
B | 4 hrs. 30 min. | 90 + 50 | |||
C | 5 hours | 100 + 50 | |||
6. | A | BDPK-MGBK-BDPK | 11 KMs | 2 hrs. 30 min. | 50 + 50 |
B | 3 hours | 60 + 50 | |||
C | 3 hrs. 30 min. | 70 + 50 | |||
D | 4 hrs. | 89+50 | |||
7. | A | CAP-IREL-CAP 1 | 15 KMs | 4 hours | 80 + 50 |
B | 4 hrs. 30 min. | 90 + 50 | |||
C | 5 hours | 100 + 50 | |||
8. | D | ADB yard, PRDP MCHP-ADB | 16 KMs | 6hours | 120 + 50 |
9 | D | ADB yard, PRDP MCHP-RRS3/Indra Park-PRDP | 16 KMs | 6 hours | 200 + 50 |
10. | A | PRDP-CBSP PRDP | 8 KMs | 5 hours | 100 + 50 |
B | 5 hrs 30 min | 110 + 50 | |||
C | 6 hours | 120 + 50 | |||
D | 7 hours | 140 + 50 | |||
11. | A | PRDP-PICT PRDP | 13 KMs | 5 hours | 100 + 50 |
B | 5 hrs 30 min | 110 + 50 | |||
C | 6 hours | 120 + 50 | |||
D | 7 hours | 140 + 50 | |||
12. | A | PRDP-IPCP PRDP | 6.5 KMs | 3 hours | 60 + 50 |
B | 3 hrs 30 min | 70 + 50 | |||
C | 5 hours | 100 + 50 | |||
D | 6 hours | 120 + 50 | |||
13. | A | CBT-ICCC-CBT | 18 kms | 2 hrs 30 min | 50 + 50 |
B | 3 hours | 60 + 50 | |||
C | 3 hrs 30 min | 70 + 50 | |||
D | 4 hours | 80 + 50 | |||
14. | C | ANGL NTPC(NY) ANGL | 37 kms | 7 hours | 140 + 50 |
15. | D | TLHR NTPC (MGR) TLHR | 66 kms | 9 hours | 180 + 50 |
16 | D | TLHR TTPC TLHR | 8 kms | 6 hours | 120 + 50 |
17. | A | TLHR -DBColliery- TLHR | 3 kms | 3 hours | 60 + 50 |
B | 3 hrs 30 min | 70 + 50 | |||
C | 4 hours | 80 + 50 | |||
D | 6 hours | 120 + 50 | |||
18. | A | TLHR- LRST-TLHR | 4.5 kms | 3 hours | 60 + 50 |
B | 3 hrs 30 min | 70 + 50 | |||
C | 5 hours | 100 + 50 | |||
D | 7 hours | 140 + 50 | |||
19. | A | TLHR- MGCT-TLHR | 6 kms | 3 hours | 60 + 50 |
B | 3 hrs 30 min | 70 + 50 | |||
C | 4 hours | 80 + 50 | |||
D | 6 hours | 120 + 50 | |||
20. | A | TLHR-SPUR(1-6)-TLHR | 14 kms | 3 hours | 60 + 50 |
B | 3 hrs 30 min | 70 + 50 | |||
C | 4 hours | 80 + 50 | |||
D | 6 hours | 120 + 50 | |||
21. | A | TLHR-SPUR(7-8)-TLHR | 28 kms | 4 hours | 80 + 50 |
B | 4 hrs 30 min | 90 + 50 | |||
C | 5 hours | 100 + 50 | |||
D | 7 hours | 140 + 50 | |||
22. | A | TLHR-SPUR(9)-/SSMT(SILO)-TLHR | 36 kms | 5 hours | 100 + 50 |
B | 5 hrs 30 min | 110 + 50 | |||
C | 6 hrs | 120 + 50 | |||
D | 8 hours | 160 + 50 | |||
23. | A | TLHR-NTPC(YARD)-TLHR | 6 kms | 5 hours | 100 + 50 |
B | 5 hrs 30 min | 110 + 50 | |||
C | 6 hours | 120 + 50 | |||
24. | A | JKPR-TSLI-JKPR | 26 kms | 5 hours | 100 + 50 |
B | 3 hrs 30 min | 110 + 50 | |||
C | 6 hours | 120 + 50 | |||
25. | A | TOMKA-DATR-TOMK | 16 kms | 1 hrs 30 min | 30 + 50 |
B | 2 hrs 30 min | 50 + 50 | |||
C | 3 hours | 60 + 50 | |||
D | 6 hours | 120 + 50 |
7th Pay Commission: Railway Board clarification on restriction of Officiating Pay under FR-35 detailed FAQ alongwith suitable illustrations
Annexure-2
Minimum Guaranteed Kilometerage Sections in WAT Division:
1. VZM- SCMN/WMY-VZM
2. RGDA-PVP- RGDA
3. RGDA-THV-RGDA
4. RGDA-BLMK- RGDA
5. TKRl-MUAT-TKRI
6. KRPU -DMNJ-MVF- KRPU
7. WMY/SCMN-MVW-VSPS/MGPV-WMY/ CMN
8. WMY/SCMN -CCJS-WMY/SCMN
9. RGDA-THV-IMFT-RGDA
10. WMY/SCMN-KPL-SCMN/WMY
11. WMY/SCMN -VZM-SCMN/WMY
12. DMNJ-JYP-DMNJ
13. RGDA-PSPG-RGDA
14. WMY/SCMN-MGPV-SCMN/WMY
15. WMY/SCMN -VSPS-SCMN/WMY
Trip Targets in WAT Division:
Sl. No. | Pattern of Working | Jurisdiction | Actual distance(IN KMs) | Trip target time (in hours) | Kilometrage earning + Bonus |
1. | D(BOBR) | WMY/SCMN -STDV-WMY/SCMN | 73.96 KMs | 8 hours | 160 + 50 |
2. | A | WMY/SCMN -STDV-WMY/SCMN | 73.96 KMs | 5 hOURS | 100 + 50 |
B | 5 hrs. 30 min. | 110 + 50 | |||
C | 6 hrs | 120 + 50 | |||
3. | A | WMY/SCMN -PDT-APWP-PDT-WMY/SCMN | 32.74 KMs | 3 hrs. 30 min. | 70 + 50 |
B | 4 hrs. | 80 + 50 | |||
C | 4 hrs. 30 min. | 90 + 50 | |||
4. | A | WMY/SCMN -MVW-PGSA-MVW-WMY/SCMN | 71 KMs | 5 hrs. 30 min. | 110 + 50 |
B | 6 hours | 120 + 50 | |||
C | 6 hrs. 30 min. | 130 + 50 | |||
5. | A | WMY/SCMN-MGPV-DVD-WMY/SCMN | 73.96 KMs | 6 hours | 130 + 50 |
B | 7 hours | 140 + 50 | |||
C | 7 hrs. 30 min. | 150 + 50 | |||
6 | A | WMY/SCMN-MGPV-VSPS/STDV-WMY/SCMN | 121.98 | 7 hours | 140 + 50 |
B | 7 hrs. 30 min. | 150 + 50 | |||
C | 8 hours | 160 + 50 | |||
7. | C | WMY/SCMN-CCIS-MGPV/VSPS-WMY/SCMN | 98.16 | 7 hours | 140 + 50 |
Kendriya Vidyalaya Admission Guidelines 2020-21
Annexure-3
Minimum Guaranteed Kilometerage Sections in SBP Division:
1. SBP-LPG-SBP
2. SBP-LPG-JSG
3. SBP-SBPY-JSG
4.SBP-JSG
5. JSG-SBP
6. JSG-SBPY-SBP
7. JSG-LPG-SBP
8. SBP-BRGA-SBO
9 . TIG-KBI-TIG
10.SBP-BRJN
11. BRJN-SBP
12. SBPY – BRJN
13. BRJN- SBPY
14. MSMD-RGDA
15. AMB-RGDA
16. RGDA-AMB
Trip Targets in SBP Division:
Sl. No. | Pattern of Working | Jurisdiction | Actual distance(IN KMs) | Trip target time (in hours) | Kilometrage earning + Bonus |
1. | A | BXQ-MABV-BXQ | 13.89 KMS | 2 hours | 40 + 50 |
B | 3 hours | 60 + 50 | |||
C | 5 hours | 100 + 50 | |||
C(BFK/BLC-IN RETURN) | 6 hours | 120 + 50 | |||
D(BOBRN) | 5 hours | 100 + 50 | |||
2. | A | BXQ-SEBD-BXQ | 12.4 KMS | 2 hrs. 30 min. | 50 + 50 |
B | 3 hours | 60 + 50 | |||
C | 4 hrs. 30 min. | 90 + 50 | |||
D(BOBRN) | 4 hours | 80 + 50 | |||
3. | A | LPG-BPSL-LPG | 8.2 KMS | 1 hrs. 45 min. | 35 + 50 |
B | 2 hrs. 30 min. | 50 + 50 | |||
C | 3 hrs. 30 min. | 70 + 50 | |||
4. | A | LPG-MAIL-LPG | 5.2 KMS | 1 hrs. 45 min. | 35 + 50 |
B | 3 hrs. 15 min. | 60 + 50 | |||
C | 1 hrs. 30 min. | 65 + 50 | |||
5. | A(BTAP) | LPG-MAAL-LPG | 6.3 KMS | 1 hrs. 30 min. | 30 + 50 |
B(BTAP) | 3 hrs. | 60 + 50 | |||
C(BTAP) | 4 hrs | 80 + 50 | |||
6. | A | LPG-MAAL-LPG | 9.19 KMS | 2 hrs. 30 min. | 50 + 50 |
B | 3 hrs. | 60 + 50 | |||
C | 4 hrs. | 80 + 50 | |||
C (Smaller yard) | 4 hrs. 30 min. | 90+50 | |||
7. | A | RGL-SMER-RGL | 4.8 KMS | 2 hrs. 30 min. | 50 + 50 |
B | 3 hrs. | 60 + 50 | |||
C | 4 hrs. | 80 + 50 | |||
8. | A | SBP-HIW-SBP | 17 KMS | 2 hrs. 45 min. | 55 + 50 |
B | 3 hrs. 30 min. | 70 + 50 | |||
C | 4 hrs. | 80 + 50 | |||
9. | A | BRGA-CFDS[Ex YD]-BRGA | 3.2 KMS | 1 hrs. | 20 + 50 |
B | 3 hrs. | 60 + 50 | |||
C | 3 hrs. 30 min. | 70 + 50 | |||
10 | A | AMB-MVAA-AMB | 36.78 KMS | 2 hrs. | 40 + 50 |
B | 3 hrs. | 60 + 50 | |||
C | 6 hrs. | 120 + 50 | |||
11. | A | TIG-KSNG-TIG | 26 KMS | 2 hrs. 45 min. | 55 + 50 |
B | 3 hrs. | 60 + 50 | |||
C | 4 hrs. 30 min. | 90 + 50 | |||
12. | A | KPJG-JSPK-KPJG | 12.2 KMS | 3 hrs. | 60 + 50 |
B | 4 hrs. | 80 + 50 | |||
C | 5 hrs. | 100 + 50 |
This issue with approval of General Manager
R.N.A Parida
Chairman RRC/Dy. CPO(IR&W)
Source: Click Here to read/view pdf
[https://eastcoastrail.indianrailways.gov.in/uploads/files/1594726927130-79-20-Min.Guaranteed%20Kilometerage.pdf]
COMMENTS