Status of Cadre Review proposals processed in DoPT as on 30th April 2021

HomeDoPT OrderCadre Restructuring

Status of Cadre Review proposals processed in DoPT as on 30th April 2021

Status of Cadre Review proposals processed in DoPT as on 30th April 2021

Status of Cadre Review proposals processed in Cadre Review Division of DoPT from 1st January 2016 to 30th April 2021

A. Approved by Cabinet

S. No. Name of the Service CRC* Meeting Cabinet Approval
1 Indian Postal Service 28.12.2015 25.05.2016
2 Central Reserve Police Force 15.12.2015 29.06.2016
3 Indian Information Service 05.05.2016 24.08.2016
4 Border Security Force 29.06.2016 12.09.2016
5 Indian P & T Accounts and Finance Service 17.09.2015 27.10.2016
6 Ministry of Micro, Small and Medium Enterprises (MSME)

Indian Enterprise Development Service (IEDS)

28.12.2015 21.12.2016
7 Indian Telecom Service 06.10.2016 21.12.2016
8 Central Engineering Service (Roads) 25.04.2016 06.03.2017
9 Indian Naval Material Management Service 24.10.2013 22.06.2017
10 Indian Defence Accounts Service 09.09.2016 19.07.2017
11 Sashastra Seema Bal (SSB) (Group ‘A’ Combatised) 19.07.2017 20.12.2017
12 Central Industrial Security Force (CISF) 15.05.2017 10.01.2018
13 Indian Petroleum and Explosive Safety Service (IPESS) 09.01.2017 02.05.2018
14 Indian Railways Personnel Service 19.04.2018 19.02.2019
15 Indian Railways Traffic Service 19.04.2018 19.02.2019
16 Indian Railways Stores Service 19.04.2018 19.02.2019
17 Indian Railways Accounts Service 19.04.2018 19.02.2019
18 Indian Railways Service of Mechanical Engineers 19.04.2018 19.02.2019
19 Indian Railways Service of Electrical Engineers 19.04.2018 19.02.2019
20 Indian Railways Service of Engineers 19.04.2018 19.02.2019
21 Indian Railways Service of Signal Engineers 19.04.2018 19.02.2019
22 Indo Tibetan Border Police 08.02.2019 23.10.2019
23 Indian P&T Building Works 02.08.2019 06.11.2019

* CRC – Cadre Review Committee

Under Secretary (CRD)
05/05/2021

B. Status of Proposals under consideration

S.No. Name of the Service Status
(1) Meeting of Cadre Review Committee held (9)
1. Indian Defence Estates Service Cadre Controlling Authority (CCA) to take approval of the Cabinet.
2. Indian Naval Armament Service CCA to take approval of the Cabinet.
3. Indian Cost Accounts Service CCA to take approval of the Cabinet.
4. Military Engineering Service (IDSE, Surveyor, Architect) CCA to take approval of the Cabinet
5. Central Geological Service Group ‘A’ CCA to take approval of the Cabinet
6. Geological Survey of India

Chemical Service Group ‘A’

CCA to take approval of the Cabinet
7. Geological Survey of India

Geophysical Service Group ‘A’

CCA to take approval of the Cabinet
8. Geological Survey of India

Engineering Service Group ‘A’

CCA to take approval of the Cabinet
9. Indian Corporate Law Service Recommendations of CRC approved by MoS (PP). File sent to DoE for obtaining approval of Finance Minister.
(2) Considered by CRC and action required to be taken as per directions (2)
10. Survey of India Group ‘A’ As per directions of CRC, CCA to provide necessary details.
11. Indian Radio Regulatory Service As per directions of CRC, CCA to provide detailed/revised information to DoPT.
(3) Pending for consideration of CRC (2)
12. Railway Protection Force Proposal to be considered by the CRC.
13. Indian Railway Health Service Proposal to be considered by the CRC.
(3) Pending with Department of Expenditure (1)
14. Medical Cadres of CAPFs, NSG & AR Recommendations of DoPT sent to DoE for obtaining approval of Secretary (Expenditure).
(4) Pending with DoPT (0)
(5) Information/clarification/reply pending with CCA (4)
15. Central Health Service (CHS) Recommendations of DoE received. Reply from CCA is awaited.
16. Indian Ordnance Factories Health Services (IOFHS) Recommendations of DoE received. Reply from CCA is awaited.
17. Indian Skill Development Service MSDE to provide requisite information/ clarification.
18. Central Engineering Service (Roads) CCA to provide necessary information.

Under Secretary (CRD)
05/05/2021

C. Central Group ‘A’ Services where CCA requires to submit cadre review proposal by April 2021 as per Calendar for cadre review issued on 09.02.2021 (OM No. I. 11019/09/2021-CRD) and status of the proposal:

S. No. Name of Service Status
1 Central Engineering Service (CPWD) Proposal yet to be received.
2. Central Electrical and Mechanical Engineering Service (CPWD) Proposal yet to be received.
3. Central Architect Service (CPWD) Proposal yet to be received.
4. Central Labour Service Proposal yet to be received.

D. Central Group ‘ A’ Services where CCA requires to submit cadre review proposal by May 2021 as per Calendar for cadre review issued on 09.02.2021 (OM No. I. 11019/09/2021-CRD) and status of the proposal:

S. No. Name of Service Status
1 Central Water Engineering Service Proposal yet to be received.
2. Defence Quality Assurance Service Proposal yet to be received.
3. Indian Economic Service Proposal yet to be received.
4. Central Power Engineering Service Proposal yet to be received.
5. Indian Postal Service Proposal yet to be received.

Note: (1) CCAs for Services at Sl. No. 1 to 8 (of part B) to provide present status.
(2) CCAs for Services at Sl. No. 10 and 11 (of part B) to provide status report on directions of CRC.
(2) CCAs for Services at Sl. No. 15, 16 and 18 (of part B) may provide the reply at the earliest.
(3) CCAs for Service at Sl. No. 17 (of part B) may expedite the proposal/revised information at the earliest.
(4) CCAs for Services at Sl. No. 1 to 4 (of part C) and Sl. No. 1 to 5 (of part D) may expedite the proposal.
(5) CCAs for the Services listed in Calendar for cadre review issued on 09.02.2021 are requested to initiate action so that the proposal/details be submitted as per the said calendar.
(5) All CCAs of Central Group ‘A’ Services (wherever due) to provide Statistical Profile (as on 1/1/2021) and Service Profile to DoPT.
(6) Replies/Information/queries (if any) on any of the above could be sent on mail: harmit.pahuja[at]gov.in, randhir.kumar14[at]nic.in also.

Under Secretary (CRD)
05/05/2021

status-of-cadre-review-proposals-as-on-30th-april-2021

Source: Cadre Review Status as on 30 04 2021

COMMENTS

WORDPRESS: 0