HomeRailways

Restructuring of Senior Engineer ( IT) and Junior Engineer(IT) posts of IT Cadre in Zonal Railways/Production Units

Restructuring of Senior Engineer ( IT) and Junior Engineer(IT) posts of IT Cadre in Zonal Railways/Production Units
(เคญเคพเคฐเคค เคธเคฐเค•เคพเคฐ) GOVERNMENT OF INDIA
(เคฐเฅ‡เคฒ เคฎเค‚เคคเฅเคฐเคพเคฒเคฏ) MINISTRY OF RAILWAYS
(เคฐเฅ‡เคฒเคตเฅ‡ เคฌเฅ‹เคฐเฅเคก) RAILWAY BOARD
RBA No 22/2019
No. 2016/AC-II(CC)/37/9
28-3-2019
General Managers,
All Zonal Railways and Production Units (including RDSO)

Sub:- Re-Structuring of IT Cadre in Zonal Railways/Production Units.

Ref:- Board โ€˜s letter of even No. dated 18.04.2017 (RBA 45/2017). 
Further to the instructions issued vide Boardโ€™s letter ibid, the matter regarding restructuring of Senior Engineer ( IT) and Junior Engineer(IT) โ€˜s post of IT Cadre in Zonal Railway s/Production Units has again been reviewed in the Ministry of Railways and it has now been decided with the approval of competent authority, that the cadre re-structuring of the post of Senior Engineer (IT) and Junior Engineer(IT) of IT Cadre, earlier approved on the basis of operated strength as on 1.4.2017 in the ratio of 67:33 respectively, shall now be done on the basis of Sanctioned Strength of Senior Engineer (IT) and Junior Engineer (IT) w.e.f. 1.4.2017. The entire up-gradation has to be revenue neutral. Accordingly, the revised sanctioned strength of Senior Engineer (IT) and Junior Engineer (IT) of IT Cadre in Zonal Railways/Production Units as on 1.4.2017 after restructuring duly taking into account the surrender of JE/ IT posts shall be as under :-
S.No Zonal Railway/Production Unit Revised Sanctioned Strength after restructuring w.e.f 1.4.2017
JE/IT SE/IT Total
1 Central Railway 23 50 73
2 Eastern Railway 49 51 100
3 Northern Railway 44 50 94
4 North Eastern Railway 20 37 57
5 North East Frontier Railway 8 90 98
6 Southern Railway 20 37 57
7 South Central Railway 13 51 64
8 South Eastern Railway 27 65 92
9 Western Railway 10 33 43
10 North Western Railway 10 18 28
11 West Central Railway 0 22 22
12 East Cost Railway 3 10 14
13 East Central Railway 1 16 17
14 South Western Railway 8 4 12
15 North Central Railway 16 31 47
16 South East Central Railway 5 37 42
17 Diesel Modernisation Works, Patiala 1 8 9
18 Rail Wheel Factory, Bengaluru 0 14 14
19 Chittaranjan Locomotive Works 12 31 43
20 Diesel Locomotive, Varanasi 1 31 32
21 Integral Coach Factory 7 40 47
22 Central Organisation for Railway Electrification 0 1 1
Total
278 789 1067
3. Surrender of Post in JE/IT will be effected before implementing above mentioned cadre restructure orders and the resultant imbalance/variation in the cadre due to surrender of posts of JE/IT shall be reviewed at the time of next annual review of the cadre after implementation of cadre restructuring.
4. Zonal Railways/Production Units may update the book of sanction as per the above sanctioned post w.e.f 1.4.2017..

5. All the other terms and condition mentioned in Boardโ€™s letter ibid remain unchanged.
Sd/-
(Gaisingam Kabui) 
Director Finance/CCA,
Railway Board
Source: Click here to view/download the PDF
[http://www.indianrailways.gov.in/railwayboard/uploads/directorate/accounts/downloads/Compendium_2019/42%20rba%2022_28032019.pdf]

COMMENTS

WORDPRESS: 0