HomeRailways

Restructuring of Senior Engineer ( IT) and Junior Engineer(IT) posts of IT Cadre in Zonal Railways/Production Units

Restructuring of Senior Engineer ( IT) and Junior Engineer(IT) posts of IT Cadre in Zonal Railways/Production Units
(भारत सरकार) GOVERNMENT OF INDIA
(रेल मंत्रालय) MINISTRY OF RAILWAYS
(रेलवे बोर्ड) RAILWAY BOARD
RBA No 22/2019
No. 2016/AC-II(CC)/37/9
28-3-2019
General Managers,
All Zonal Railways and Production Units (including RDSO)

Sub:- Re-Structuring of IT Cadre in Zonal Railways/Production Units.

Ref:- Board ‘s letter of even No. dated 18.04.2017 (RBA 45/2017). 
Further to the instructions issued vide Board’s letter ibid, the matter regarding restructuring of Senior Engineer ( IT) and Junior Engineer(IT) ‘s post of IT Cadre in Zonal Railway s/Production Units has again been reviewed in the Ministry of Railways and it has now been decided with the approval of competent authority, that the cadre re-structuring of the post of Senior Engineer (IT) and Junior Engineer(IT) of IT Cadre, earlier approved on the basis of operated strength as on 1.4.2017 in the ratio of 67:33 respectively, shall now be done on the basis of Sanctioned Strength of Senior Engineer (IT) and Junior Engineer (IT) w.e.f. 1.4.2017. The entire up-gradation has to be revenue neutral. Accordingly, the revised sanctioned strength of Senior Engineer (IT) and Junior Engineer (IT) of IT Cadre in Zonal Railways/Production Units as on 1.4.2017 after restructuring duly taking into account the surrender of JE/ IT posts shall be as under :-
S.No Zonal Railway/Production Unit Revised Sanctioned Strength after restructuring w.e.f 1.4.2017
JE/IT SE/IT Total
1 Central Railway 23 50 73
2 Eastern Railway 49 51 100
3 Northern Railway 44 50 94
4 North Eastern Railway 20 37 57
5 North East Frontier Railway 8 90 98
6 Southern Railway 20 37 57
7 South Central Railway 13 51 64
8 South Eastern Railway 27 65 92
9 Western Railway 10 33 43
10 North Western Railway 10 18 28
11 West Central Railway 0 22 22
12 East Cost Railway 3 10 14
13 East Central Railway 1 16 17
14 South Western Railway 8 4 12
15 North Central Railway 16 31 47
16 South East Central Railway 5 37 42
17 Diesel Modernisation Works, Patiala 1 8 9
18 Rail Wheel Factory, Bengaluru 0 14 14
19 Chittaranjan Locomotive Works 12 31 43
20 Diesel Locomotive, Varanasi 1 31 32
21 Integral Coach Factory 7 40 47
22 Central Organisation for Railway Electrification 0 1 1
Total
278 789 1067
3. Surrender of Post in JE/IT will be effected before implementing above mentioned cadre restructure orders and the resultant imbalance/variation in the cadre due to surrender of posts of JE/IT shall be reviewed at the time of next annual review of the cadre after implementation of cadre restructuring.
4. Zonal Railways/Production Units may update the book of sanction as per the above sanctioned post w.e.f 1.4.2017..

5. All the other terms and condition mentioned in Board’s letter ibid remain unchanged.
Sd/-
(Gaisingam Kabui) 
Director Finance/CCA,
Railway Board
Source: Click here to view/download the PDF
[http://www.indianrailways.gov.in/railwayboard/uploads/directorate/accounts/downloads/Compendium_2019/42%20rba%2022_28032019.pdf]

COMMENTS

WORDPRESS: 0