HomeDoPT OrderCadre Restructuring

Status of Cadre Review Proposal processed in DoPT upto 31st December, 2018

Status of Cadre Review Proposal processed in DoPT upto 31st December, 2018



Status of Cadre Review proposals processed in DoPT from


1st January, 2011 to 31st December, 2018

A. Approved by Cabinet – 28

B. Pending Proposals – 20

1. With Concerned Ministry- CRC meeting held and Cabinet approval pending – 9
2. With Cabinet Secretariat – 0
3. With Department of Personnel & Training – 7
4. With Department of Expenditure – 2
5. With Ministry concerned for clarifications – 2
A. Approved by Cabinet
S.No. Name of the Service CRC* Meeting Cabinet Approval
1 CPWD Central Engineering Service, Central Electrical &
Mechanical Engineering Service and Central Architecture
Service
27/06/2011 03/01/2012
2 Military Engineering Services of Engineers, Architect Cadre
and Surveyor Cadre)
22/09/2011 and 23/01/2012 18/04/2013
3 Indian Revenue Service 19/02/2013 and GoM** on 29/04/2013 23/05/2013
4 Indian Radio Regulatory Service 19/02/2013 03/07/2013
5 Central Labour Service 19/02/2013 17/07/2013
6 Indian Customs & Central Excise 27/08/2013 05/12/2013
7 Indian Cost Accounts Service 29/10/2013 02/01/2014
8 Central Power Engineering Service 11/12/2013 13/05/2014
9 Indian Ordnance Factory Service 19/03/2014 29/10/2014
10 Indian Civil Accounts Service 17/07/2013 16/01/2015
11 Border Road Engineering Service 26/02/2015 07/04/2015
12 Defence Aeronautical Quality Assurance Service 08/01/2015 06/05/2015
13 Indian Trade Service 06/05/2014 01/07/2015
14 Indian Statistical Service 24/06/2014 29/07/2015
15 Indian Skill Development Service 10/04/2015 07/10/2015
16 Indian Postal Service 28/12/2015 25/05/2016
17 Central Reserve Police Force 15/12/2015 29/06/2016
18 Indian Information Service 05/05/2016 24/08/2016
19 Border Security Force 29/06/2016 12/09/2016
20 Indian P & T Accounts and Finance Service 17/09/2015 27/10/2016
21 Ministry of Micro, Small and Medium Enterprises (MSME)

Indian Enterprise Development Service (IEDS)
28/12/2015 21/12/2016
22 Indian Telecom Service 06/10/2016 21/12/2016
23 Central Engineering Service (Roads) 25/04/2016 06/03/2017
24 Indian Naval Material Management Service 24/10/2013 22/06/2017
25 Indian Defence Accounts Service 09/09/2016 19/07/2017
26 Sashastra Seema Bal (SSB) (Group ‘A’ Combatised) 19/07/2017 20/12/2017
27 Central Industrial Security Force (CISF) 15/05/2017 10/01/2018
28 Indian Petroleum and Explosive Safety Service (IPESS) 09/01/2017 02/05/2018

* CRC – Cadre Review Committee

** GoM – Group of Minutes

B. Pending Proposal
Sl. No.
Name of the Service
Status

1. With Concerned Ministry – CRC meeting held and
Cabinet approval pending (9)
1. Indian Railways Personnel Service Meeting of CRC was held on 19.04.2018. Approvals of MoS
(PP) and FM have been obtained. MoR moved the Draft Cabinet
Note. MoR has been asked to revise the DCN.
2. Indian Railways Personnel Service -do-
3. Indian Railways Stores Service -do-
4. Indian Railways Accounts Service -do-
5. Indian Railways Service of Mechanical Engineers -do-
6. Indian Railways Service of Electrical Engineers -do-
7. Indian Railways Service of Engineers -do-
8. Indian Railways Service of Signal Engineers -do-
9. Railways Protection Force Request of MoR to submit a revised proposal acceded by
DoPT. They were advised to submit the revised proposal
within a month i.e. June, 2018. Revised cadre review
proposal is awaited. Reminder has been sent on 25.09.2018.
2. With Cabinet Secretariat (0)

3. With Department of Personnel & Training (7)
10. Indian Ordnance Factories Health Services (IOFHS) The approval of Secretary (Exp) obtained. Note for CRC has
been sent to Cabinet Secretariat on 25.09.2018. meeting of
CRC was held on 15.10.2018. Necessary consultations as per
directions of CRC are being taken.
11. Survey of India Group ‘A’ The cadre review proposal has been received in DoPT which
is under examination.
12. Indian Economic Service DEA was requested for certain clarification which have been
received and are under examination.
13. Indian P&T Building Works Approval of Secretary (Exp) has been obtained. CRC meeting
was held on 30.08.2018. Minutes of the meeting have been
forwarded to DoT to provide necessary inputs.
14. Indian Supply Service The proposal is under examination in consultation with
various Divisions of DoPT.
15. Indian Inspection Service The proposal is under examination in consultation with
various Divisions of DoPT
16. Indo Tibetan Border Police (ITBP) Recommendations of DoE have been received. The Note for CRC
is under preparation.
4. With Department of Expenditure (2)
17.
Indian Naval Armament Service (INAS) DoE had sought certain clarification. Reply of MoD was
received which has been sent to DoE on 04.09.2018.
18.
Indian Defence Estate Service (IDES) Recommendations of DoPT have been sent to DoE for approval
Secretary (Exp) in the last week of Oct, 2018.

5. With Ministry concerned for clarifications (2)
19. Indian Railway Medical Service (IRMS) Proposal was found incomplete. MoR has been requested to
send the complete proposal. Reminder has been sent on
28.09.2018.
20. Central Health Service (CHS) Proposal was found incomplete. MoFHW has been requested to
send the complete proposal. Reminder has been sent on
28.09.2018.

Note:
A calendar of cadre review has been issued vide OM No.I-11019/9/2018-CRD
dated 25.05.2018. The name of the Service/Cadre along with the month by
which cadre review proposal is required to be submitted to DoPT is
mentioned in the Annexure. The aforesaid OM dated 25.05.2018 is available
on the official website of DoPT i.e. www.dopt.gov.in (Link: Notification
> OMs & Orders > Cadre Review Division > General Circulars)
.
The Cadre Controlling Authority may take immediate action for compliance.
[http://documents.doptcirculars.nic.in/D2/D02adm/CRSDEC18noF9j.pdf]

COMMENTS

WORDPRESS: 0