GOVERNMENT OF INDIA
MINISTRY OF  RAILWAYS
RAJYA SABHA

QUESTION NO  87

ANSWERED ON  28.11.2014

Privatisation in Railways

87 SHRI ANIL KUMAR SAHANI
Will the Minister of RAILWAYS be pleased to satate :-

(a) whether Government plans to privatise Railways; and

(b) the number of projects of Railways in which Government plans for Foreign Direct Investment, the details thereof?

ANSWER

 
MINISTER OF RAILWAYS (SHRI SURESH PRABHAKAR PRABHU)

(a):  No, Sir.

(b): Ministry of Railways have based on initial assessment identified the following potential projects for Domestic/Foreign Direct Investment:

1. Suburban Corridor projects through PPP

S.No Project Kms Cost (Rs Crore)
1. CSTM-Panvel 49 14,000

2. High speed train projects

S.No. Project Kms Cost(Rs Cr.)
1. Mumbai-Ahmedabad 534 63,180
2. Chennai-Banglore-Mysore

3. Freight lines

S.No. Project Kms Cost(Rs.Cr.)
1 Dankuni-Gomoh New line 282 4500
2 Whitefield-Kolar (52.9 km) New Line 52.9 353.45
3 North- South DFC-New Line
4 Ajmer-Bangurgram -Doubling 48.43 144.57
5 Durg-Rajnandgaon 3rd line 31 152.99
6 Wardha(Sewagram)-Nagpur 3rd line 76.3 297.85
7 Kazipet-Vijaywada 3rd line with electrification 219.6 1054.35
8 Bhadrak-Nergundi 3rd line 80 837.33
9 Sambalpur-Talcher DL 174.1 679.27
10 Manoharpur-Bondamanda 3rd line 30 258.2
11 Rajkharswan-Chakradharpur 3rd line (20 km) 20 174.49

4. Rolling stock including train sets and locomotives or coach manufacturing and maintenance facilities

S.No Project Quantity Cost (Rs. Cr)
1 Rail Coach Factory, for manufacture of modern 3 phase MEMU/EMU coaches equipped with IGBT technology at Kachrapara. Approximate 500 EMU/ MEMU coaches annually 1,200
2. Rail coach factory for manufacturing of Aluminum coaches at Palakkad Approximately 400 coaches per annum 550
3. Periodic overhauling of wagons at Sonpur Approximately180 wagons per annum 300
4. Midlife rehabilitation of coaches at Anara Approximately 250 coaches per annum 185
5. Locomotive maintenance depots at Barauni, Daund, Mughal-sarai, Bonda-munda. 300

5. Railway Electrification Projects

S.No Project Kms Cost ( Rs . Cr)
1 Katwa-Azimganj-Nalhati & Azimganj-Tildanga/New Farakka 200 229.26

6. Signaling System

S.No Project Kms Cost (Rs. Cr)
1. Agra-Gwalior, A route: provision of automatic signaling along with train protection system to enhance line capacity. 118 250 Cr.
2. Gwalior – Burhpura A route: Provision of automatic signaling along with train protection system to enhance line capacity 126 280 Cr.
3. Burpura-Bina, A Route: Provision of automatic signaling along with train protection system to enhance line capacity. 126 270 Cr.

7. Passenger Terminals

S.No Project
1 Habibganj
2 Shivaji Nagar
3 Anand Vihar
4 Bijwasan
5 Chandigarh
6 Surat
7 Gandhinagar
8 Manglore
9 Ernakulam
10 Vijayawada
11 Nagpur
12 Byappanahalli
13 New Bhubneshwar

8. Railway Technical Training Institutes.

S.No Project Quantity Cost  (Rs. Cr)
1. Advanced Training Institute (ATI) for training of Technical staff and Loco Pilots 6 Training Centres with Driving Simulators at Mughalsarai (ECR),Kurla (CR),Asansol (ER),Vishakapatnam (ECoR),Kanpur (NCR) and Avadi (SR) 120

9. Mechanized Laundry

S.No Project
Quantity
Cost (Rs. Cr)
1. Mechanized laundries at identified locations of different capacities. 1T/2T/3T/5T per day 100

Source: RajyaSabha.nic.in

Annexure Source: https://pqars.nic.in/annex/233/As87.doc