UNSTARRED QUESTION NO 197
SHORTAGE OF HOUSES FOR GOVERNMENT EMPLOYEES
197 . Shri A.T. (NANA) PATIL
Will the Minister of URBAN DEVELOPMENT be pleased to state:-
(a) whether there is a shortage of Government accommodation for the Central Government employees in the country;
(b) if so, the details thereof indicating shortages in various types, State/UT-wise;
(c) whether the Government has formulated any action-plan to address the said shortage;
(d) if so, the details thereof; and
(e) the details of redevelopment plans of old Government colonies in Delhi?
THE MINISTER OF URBAN DEVELOPMENT (SHRI M. VENKAIAH NAIDU)
(a): Yes, Madam.
(b): The details are at Annexure-I.
Details of Demand and Availability of General Pool Residential Accommodation
1. DELHI | ||||
Type | Demand | Availability | Shortage | Surplus |
I | 12791 | 15531 | Nil | 2740 |
II | 29274 | 24360 | 4914 | 0 |
III | 20270 | 12061 | 8209 | 0 |
IV | 7737 | 5359 | 2378 | 0 |
IV Spl. | 2189 | 792 | 1397 | 0 |
V A | 1991 | 1436 | 555 | 0 |
V B | 2391 | 856 | 1535 | 0 |
VI A | 1790 | 869 | 921 | 0 |
VI B | 328 | 166 | 162 | 0 |
VII | 444 | 190 | 254 | 0 |
VIII | 193 | 108 | 85 | 0 |
DS | 3105 | 1673 | 1432 | 0 |
SK | 1358 | 287 | 1071 | 0 |
SS | 566 | 129 | 437 | 0 |
Total | 84427 | 63817 | 23350 | 2740 |
2. MAHARASHTRA | ||||
MUMBAI | ||||
Type | Demand | Availability | Shortage | Surplus |
I | 1836 | 2005 | 0 | 169 |
II | 5641 | 3282 | 2359 | 0 |
III | 3502 | 1702 | 1800 | 0 |
IV | 680 | 728 | 0 | 48 |
IV Spl | 210 | 72 | 138 | 0 |
V | 477 | 247 | 230 | 0 |
VI | 224 | 44 | 180 | 0 |
DS | 101 | 122 | 0 | 21 |
SK | 141 | 14 | 127 | 0 |
Sub total | 12812 | 8216 | 4834 | 238 |
NAGPUR | ||||
I | 92 | 247 | 0 | 155 |
II | 827 | 930 | 0 | 103 |
III | 369 | 447 | 0 | 78 |
IV | 127 | 173 | 0 | 46 |
V | 58 | 93 | 0 | 35 |
VI | 2 | 12 | 0 | 10 |
Out houses | 5 | 12 | 7 | |
Sub total | 1480 | 1914 | 0 | 434 |
PUNE | ||||
I | 16 | 15 | 1 | 0 |
II | 115 | 75 | 40 | 0 |
III | 126 | 120 | 6 | 0 |
IV | 60 | 60 | 0 | 0 |
V | 10 | 10 | 0 | 0 |
Sub total | 327 | 280 | 47 | 0 |
Total | 14619 | 10410 | 4881 | 672 |
3. WEST BENGAL | ||||
KOLKATA | ||||
Type | Demand | Availability | Shortage | Surplus |
I | 413 | 1692 | 0 | 1279 |
II | 3656 | 2679 | 977 | 0 |
III | 1686 | 1558 | 128 | 0 |
IV | 524 | 213 | 311 | 0 |
V | 273 | 190 | 83 | 0 |
VI | 160 | 103 | 57 | 0 |
SK | 91 | 98 | 0 | 7 |
DS | 167 | 104 | 63 | 0 |
Sub total | 6970 | 6637 | 1619 | 1286 |
SILIGURI | ||||
I | 24 | 24 | 0 | 0 |
II | 24 | 24 | 0 | 0 |
III | 40 | 40 | 0 | 0 |
IV | 12 | 12 | 0 | 0 |
Sub total | 100 | 100 | 0 | 0 |
Total | 7070 | 6737 | 1619 | 1286 |
4. STATE: HARYANA | ||||
FARIDABAD | ||||
I | 504 | 482 | 22 | 0 |
II | 938 | 832 | 106 | 0 |
III | 619 | 328 | 291 | 0 |
IV | 177 | 140 | 37 | 0 |
V | 54 | 52 | 2 | 0 |
VI | 16 | 16 | 0 | 0 |
Total | 2308 | 1850 | 458 | 0 |
5. TAMILNADU | ||||
CHENNAI | ||||
Type | Demand | Availability | Shortage | Surplus |
I | 801 | 450 | 351 | 0 |
II | 1765 | 944 | 821 | 0 |
III | 1639 | 660 | 979 | 0 |
IV | 847 | 379 | 468 | 0 |
V | 305 | 138 | 167 | 0 |
VI | 63 | 20 | 43 | 0 |
SK | 151 | 20 | 131 | 0 |
DU | 177 | 30 | 147 | 0 |
KKN Hostel | 30 | 30 | 0 | 0 |
Total | 5778 | 2671 | 3107 | 0 |
6. HIMACHAL PRADESH | ||||
SHIMLA | ||||
I | 285 | 285 | 0 | 0 |
II | 600 | 388 | 212 | 0 |
III | 464 | 374 | 90 | 0 |
IV | 111 | 96 | 15 | 0 |
V | 25 | 25 | 0 | 3 |
VI | 4 | 4 | 0 | 0 |
Total | 1489 | 1172 | 317 | 4 |
7. U.T. : CHANDIGARH | ||||
CHANDIGARH | ||||
I | 696 | 710 | 0 | 14 |
II | 1186 | 1070 | 116 | 0 |
III | 600 | 542 | 58 | 0 |
IV | 244 | 109 | 135 | 0 |
V | 103 | 70 | 33 | 0 |
VI | 25 | 5 | 20 | 0 |
Total | 2854 | 2506 | 362 | 14 |
8. STATE: UTTARPRADESH | ||||
GHAZIABAD | ||||
Type | Demand | Availability | Shortage | Surplus |
I | 170 | 176 | 0 | 6 |
II | 538 | 480 | 58 | 0 |
III | 212 | 132 | 80 | 0 |
IV | 62 | 24 | 38 | 0 |
V | 16 | 8 | 8 | 0 |
Sub total | 998 | 820 | 184 | 6 |
LUCKNOW | ||||
I | 364 | 272 | 92 | 0 |
II | 824 | 474 | 350 | 0 |
III | 318 | 223 | 95 | 0 |
IV | 134 | 90 | 44 | 0 |
V | 46 | 32 | 14 | 0 |
VI | 4 | 2 | 2 | 0 |
Sub total | 1690 | 109 3 | 597 | 0 |
AGRA | ||||
I | 8 | 15 | 0 | 7 |
II | 30 | 30 | 0 | 0 |
III | 60 | 60 | 0 | 0 |
IV | 14 | 14 | 0 | 0 |
V | 5 | 5 | 0 | 0 |
Sub total | 117 | 124 | 0 | 7 |
ALLAHABAD | ||||
Type | Demand | Availability | Shortage | Surplus |
I | 100 | 114 | 0 | 14 |
II | 402 | 437 | 0 | 35 |
III | 206 | 282 | 0 | 76 |
IV | 39 | 44 | 0 | 5 |
V | 10 | 11 | 0 | 1 |
VI | 1 | 2 | 0 | 1 |
Sub total | 758 | 890 | 0 | 132 |
KANPUR | ||||
I | 104 | 293 | 0 | 189 |
II | 292 | 351 | 0 | 59 |
III | 131 | 158 | 0 | 27 |
IV | 39 | 60 | 0 | 21 |
V | 30 | 31 | 0 | 1 |
Sub total | 596 | 893 | 0 | 297 |
VARANASI | ||||
I | 11 | 24 | 0 | 13 |
II | 39 | 60 | 0 | 21 |
III | 55 | 102 | 0 | 47 |
IV | 12 | 12 | 0 | 0 |
Sub total | 117 | 198 | 0 | 81 |
BAREILLY | ||||
I | 0 | 0 | 0 | 0 |
II | 12 | 12 | 0 | 0 |
III | 18 | 18 | 0 | 0 |
IV | 13 | 18 | 0 | 5 |
V | 5 | 5 | 0 | 0 |
Sub total | 48 | 53 | 0 | 5 |
Total | 4324 | 4071 | 781 | 528 |
9. STATE:KARNATAKA | ||||
BANGALARU | ||||
Type | Demand | Availability | Shortage | Surplus |
I | 441 | 380 | 61 | 0 |
II | 747 | 384 | 363 | 0 |
III | 640 | 470 | 170 | 0 |
IV | 253 | 214 | 39 | 0 |
V | 73 | 46 | 27 | 0 |
VI | 30 | 4 | 26 | 0 |
SK | 58 | 56 | 2 | 0 |
DS | 34 | 34 | 0 | 0 |
Sub total | 2276 | 1588 | 688 | 0 |
MYSORE | ||||
Type | Demand | Availability | Shortage | Surplus |
I | 20 | 32 | 0 | 12 |
II | 35 | 40 | 0 | 5 |
III | 40 | 40 | 0 | 0 |
IV | 15 | 16 | 0 | 1 |
V | 8 | 8 | 0 | 0 |
Sub total | 118 | 136 | 0 | 18 |
Total | 2394 | 1724 | 688 | 18 |
10. STATE: ANDHRA PRADESH | ||||
HYDERABAD | ||||
I | 104 | 184 | 0 | 80 |
II | 466 | 416 | 50 | 0 |
III | 305 | 224 | 81 | 0 |
IV | 36 | 32 | 4 | 0 |
V | 35 | 36 | 0 | 1 |
Hostel | 28 | 32 | 0 | 4 |
Total | 974 | 924 | 135 | 85 |
11. U.T.: ANDMAN & NICOBAR | ||||
PORT BLAIR | ||||
I | 40 | 36 | 4 | 0 |
II | 67 | 63 | 4 | 0 |
III | 131 | 88 | 43 | 0 |
IV | 23 | 22 | 1 | 0 |
V | 10 | 10 | 0 | 0 |
Total | 271 | 219 | 52 | 0 |
12. STATE:MANIPUR | ||||
IMPHAL | ||||
I | 24 | 20 | 4 | 0 |
II | 41 | 32 | 9 | 0 |
III | 29 | 24 | 5 | 0 |
IV | 6 | 4 | 2 | 0 |
Total | 100 | 80 | 20 | 0 |
13. STATE:UTTRAKHAND | ||||
DEHRADUN | ||||
Type | Demand | Availability | Shortage | Surplus |
I | 18 | 10 | 8 | 0 |
II | 50 | 2 | 48 | 0 |
III | 62 | 8 | 54 | 0 |
IV | 19 | 2 | 17 | 0 |
Total | 149 | 22 | 127 | 0 |
14. STATE:SIKKIM | ||||
GANGTOK | ||||
Type | Demand | Availability | Shortage | Surplus |
I | 27 | 24 | 3 | 0 |
II | 92 | 24 | 68 | 0 |
III | 49 | 40 | 9 | 0 |
IV | 27 | 12 | 15 | 0 |
V | 9 | 6 | 3 | 0 |
Total | 204 | 106 | 98 | 0 |
15. STATE: RAJASTHAN | ||||
JODHPUR | ||||
I | 104 | 104 | 0 | 0 |
II | 103 | 103 | 0 | 0 |
III | 92 | 92 | 0 | 0 |
IV | 22 | 22 | 0 | 0 |
V | 4 | 4 | 0 | 0 |
VI | 3 | 3 | 0 | 0 |
Sub total | 328 | 328 | 0 | 0 |
JAIPUR | ||||
I | 93 | 89 | 4 | 0 |
II | 157 | 128 | 29 | 0 |
III | 230 | 228 | 2 | 0 |
IV | 73 | 72 | 1 | 0 |
V | 25 | 24 | 1 | 0 |
VI | 8 | 6 | 2 | 0 |
Sub total | 586 | 547 | 39 | 0 |
BIKANER | ||||
Type | Demand | Availability | Shortage | Surplus |
I | 6 | 6 | 0 | 0 |
II | 6 | 6 | 0 | 0 |
III | 8 | 8 | 0 | 0 |
IV | 1 | 1 | 0 | 0 |
Sub total | 21 | 21 | 0 | 0 |
Total | 935 | 896 | 36 | 0 |
16. STATE:KERALA | ||||
COCHIN | ||||
I | 19 | 32 | 0 | 13 |
II | 113 | 116 | 0 | 3 |
III | 78 | 68 | 10 | 0 |
IV | 36 | 24 | 12 | 0 |
V | 9 | 4 | 5 | 0 |
Sub total | 255 | 244 | 27 | 16 |
CALICUT | ||||
II | 14 | 14 | 0 | 0 |
III | 14 | 14 | 0 | 0 |
IV | 14 | 14 | 0 | 0 |
V | 10 | 14 | 0 | 4 |
VI | 1 | 2 | 0 | 1 |
Sub total | 53 | 58 | 0 | 5 |
TRIVANDRUM | ||||
Type | Demand | Availability | Shortage | Surplus |
I | 41 | 16 | 25 | 0 |
II | 79 | 16 | 63 | 0 |
III | 151 | 134 | 17 | 0 |
IV | 59 | 52 | 7 | 0 |
V | 13 | 12 | 1 | 0 |
Sub total | 343 | 230 | 113 | 0 |
Total | 651 | 532 | 140 | 21 |
17. STATE:MEGHALAYA | ||||
SHILLONG | ||||
Type | Demand | Availability | Shortage | Surplus |
I | 27 | 22 | 5 | 0 |
II | 77 | 34 | 43 | 0 |
III | 38 | 24 | 14 | 0 |
IV | 22 | 8 | 14 | 0 |
V | 3 | 2 | 1 | 0 |
Total | 167 | 90 | 77 | 0 |
18. STATE:MADHYA PRADESH | ||||
BHOPAL | ||||
Type | Demand | Availability | Shortage | Surplus |
I | 32 | 32 | 0 | 0 |
II | 74 | 52 | 22 | 0 |
III | 63 | 60 | 3 | 0 |
IV | 50 | 14 | 36 | 0 |
V | 20 | 8 | 12 | 0 |
Total | 239 | 166 | 73 | 0 |
INDORE | ||||
I | 63 | 108 | 0 | 45 |
II | 132 | 132 | 0 | 0 |
III | 119 | 108 | 11 | 0 |
IV | 26 | 26 | 0 | 0 |
V | 8 | 8 | 0 | 0 |
VI | 2 | 2 | 0 | 0 |
Total | 350 | 384 | 11 | 45 |
19. STATE:TRIPURA | ||||
AGARTALA | ||||
I | 56 | 48 | 8 | 0 |
II | 72 | 46 | 26 | 0 |
III | 77 | 54 | 23 | 0 |
IV | 27 | 12 | 15 | 0 |
V | 7 | 4 | 3 | 0 |
Total | 239 | 164 | 75 | 0 |
20. STATE:GUJRAT | ||||
RAJKOT | ||||
Type | Demand | Availability | Shortage | Surplus |
I | 39 | 48 | 0 | 9 |
II | 41 | 48 | 0 | 7 |
III | 30 | 36 | 0 | 6 |
IV | 8 | 8 | 0 | 0 |
Total | 118 | 140 | 0 | 22 |
21. STATE:NAGALAND | ||||
KOHIMA | ||||
Type | Demand | Availability | Shortage | Surplus |
I | 8 | 8 | 0 | 0 |
II | 16 | 16 | 0 | 0 |
III | 40 | 40 | 0 | 0 |
Total | 64 | 64 | 0 | 0 |
22. STATE:JAMMU & KASHMIR | ||||
SRINAGAR | ||||
I | 0 | 30 | 0 | 30 |
II | 82 | 114 | 0 | 32 |
III | 50 | 84 | 0 | 34 |
IV | 14 | 16 | 0 | 2 |
V | 5 | 6 | 0 | 1 |
Total | 151 | 250 | 0 | 99 |
23. STATE:ASSAM | ||||
GUWAHATI | ||||
I | 23 | 23 | 0 | 0 |
II | 53 | 24 | 29 | 0 |
III | 81 | 72 | 9 | 0 |
IV | 27 | 24 | 3 | 0 |
Total | 184 | 143 | 41 | 0 |
24. STATE:GOA | ||||
GOA | ||||
II | 35 | 5 | 30 | 0 |
III | 33 | 17 | 16 | 0 |
IV | 6 | 6 | 0 | 0 |
Total | 74 | 28 | 46 | 0 |
Proposed scope of Redevelopment of Sriniwaspuri, Sarojini Nagar & Mohammadpur and GPRA Colonies. Development of CPWD land at Ghitorni
S. No | Dwelling Unit Category | Re-Development | Development | Total | |||||||
Sriniwaspuri Area- 73.14 Acre |
Mohammadpur Area- 7.71 Acre |
Sarojini Nagar Area- 288.07 Acre | Ghitorni Area- 239.64 Acre | ||||||||
No. of DUs | |||||||||||
Existing | Proposed | Existing | Proposed | Existing | Proposed | Existing | Proposed | Existing | Proposed | ||
Residential Area | |||||||||||
1 | Type-I | 648 | – | 328 | – | – | – | – | – | 976 | – |
2 | Type-II | 756 | 1,204 | – | 384 | – | – | – | 1,000 | 756 | 2,588 |
3 | Type-III | 28 | 1,824 | – | 352 | 4,499 | 3,808 | – | 2,250 | 4,527 | 8,234 |
4 | Type-IV | – | 574 | – | – | 188 | 1,680 | – | – | 188 | 2,254 |
5 | Type-IV Spl. | – | – | – | – | – | 1,456 | – | 2,030 | – | 3,486 |
6 | Type-V | – | – | – | – | – | 1,764 | – | 1,338 | – | 3,102 |
7 | Type-VI | – | – | – | – | – | 504 | – | 975 | – | 1,479 |
8 | Type-VII | – | – | – | – | – | 84 | – | 175 | – | 259 |
9 | Type-VIII | – | – | – | – | – | 56 | – | 50 | – | 106 |
Total Nos. | 1,432 | 3,602 | 328 | 736 | 4,687 | 9,352 | – | 7,818 | 6,447 | 21,508 | |
Commercial Area | – | 46,979 Sqm | – | 9,360 Sqm | – | 1,87,806 Sqm | – | 5,58,400 Sqm | – | 8,02,545 Sqm | |
Community Area | – | 46,979 Sqm | – | 9,360 Sqm | – | 1,87,806 Sqm | – | 69,760 Sqm | – | 3,13,905 Sqm |
Proposed scope of Redevelopment of Kidwai Nagar (East), Kasturba Nagar, Thyagraj Nagar and Netaji Nagar.
S.No. | Dwelling Unit Category | Redeveopment | |||||||
Kidwai Nagar (East) | Kasturba Nagar | Thyagraj Nagar | Netaji Nagar | ||||||
Existing | Proposed | Existing | Proposed | Existing | Proposed | Existing | Proposed | ||
1 | Type-I | 1336 | — | 2521 | — | 131 | — | 1369 | — |
2 | Type-II | 1000 | 1000 | — | 3048 | — | — | 1107 | 2408 |
3 | Type-III | — | 800 | — | — | — | — | 164 | — |
4 | Type-IV | — | 1500 | — | 509 | — | 116 | 132 | 1911 |
5 | Type-IV Spl. |
— | — | — | — | — | — | — | — |
6 | Type-V | 108 | 1000 | — | 509 | — | 94 | — | 1911 |
7 | Type-VI | — | 200 | — | 255 | — | 72 | — | 1065 |
8 | Type-VII | — | 50 | — | — | — | — | — | — |
9 | Type-VIII | — | — | — | — | — | — | — | — |
Total | 2444 | 4550 | 2521 | 4321 | 131 | 282 | 2772 | 7295 |
Annexure Source: http://164.100.47.132/Annexture_New/lsq16/2/au197.htm
Stay connected with us via Facebook, Google+ or Email Subscription.
Subscribe to Central Government Employee News & Tools by Email [Click Here]
Follow us: Twitter [click here] | Facebook [click here] | Google+ [click here]
Admin
COMMENTS